Fault tree analysis for integrated and probabilistic risk analysis of drinking water systems

Andreas Lindhe (Institutionen för bygg- och miljöteknik, Geologi och geoteknik ; DRICKS Ramprogrammet för dricksvattenforskning vid Chalmers) ; Lars Rosén (Institutionen för bygg- och miljöteknik, Geologi och geoteknik ; FRIST kompetenscentrum ; DRICKS Ramprogrammet för dricksvattenforskning vid Chalmers) ; Tommy Norberg (Institutionen för matematiska vetenskaper, matematisk statistik ; FRIST kompetenscentrum ) ; Olof Bergstedt (Institutionen för bygg- och miljöteknik, Vatten Miljö Teknik)
Water Research (0043-1354). Vol. 43 (2009), 6, p. 1641-1653.
[Artikel, refereegranskad vetenskaplig]

Drinking water systems are vulnerable and subject to a wide range of risks. To avoid sub-optimisation of risk-reduction options, risk analyses need to include the entire drinking water system, from source to tap. Such an integrated approach demands tools that are able to model interactions between different events. Fault tree analysis is a risk estimation tool with the ability to model interactions between events. Using fault tree analysis on an integrated level, a probabilistic risk analysis of a large drinking water system in Sweden was carried out. The primary aims of the study were: (1) to develop a method for integrated and probabilistic risk analysis of entire drinking water systems; and (2) to evaluate the applicability of Customer Minutes Lost (CML) as a measure of risk. The analysis included situations where no water is delivered to the consumer (quantity failure) and situations where water is delivered but does not comply with water quality standards (quality failure). Hard data as well as expert judgements were used to estimate probabilities of events and uncertainties in the estimates. The calculations were performed using Monte Carlo simulations. CML is shown to be a useful measure of risks associated with drinking water systems. The method presented provides information on risk levels, probabilities of failure, failure rates and downtimes of the system. This information is available for the entire system as well as its different sub-systems. Furthermore, the method enables comparison of the results with performance targets and acceptable levels of risk. The method thus facilitates integrated risk analysis and consequently helps decision-makers to minimise sub-optimisation of risk-reduction options.

Nyckelord: Drinking water system, Risk analysis, Fault tree, Integrated, Probabilistic, Customer Minutes Lost, Uncertainties



Den här publikationen ingår i följande styrkeområden:

Läs mer om Chalmers styrkeområden  

Denna post skapades 2009-03-23. Senast ändrad 2015-01-08.
CPL Pubid: 91772

 

Läs direkt!


Länk till annan sajt (kan kräva inloggning)


Institutioner (Chalmers)

Institutionen för bygg- och miljöteknik, Geologi och geoteknik (2005-2017)
DRICKS Ramprogrammet för dricksvattenforskning vid Chalmers
FRIST kompetenscentrum
Institutionen för matematiska vetenskaper, matematisk statistik (2005-2016)
Institutionen för bygg- och miljöteknik, Vatten Miljö Teknik (2005-2017)

Ämnesområden

Building Futures
Matematisk statistik
Vatten i natur och samhälle
Samhällsbyggnadsteknik

Chalmers infrastruktur

Relaterade publikationer

Denna publikation ingår i:


Risk Assessment and Decision Support for Managing Drinking Water Systems