Integration of a gas turbine with back pressure power generation as a more efficient combined cycle plant

Lennart Jarlevang (Institutionen för värmeteknik och maskinlära) ; Torgny Johansson (Institutionen för värmeteknik och maskinlära)
Energy Technology Vol. 1982 (1982), 4, p. 6-9.
[Artikel, övrig]

The rising cost of energy has compelled most countries to seek methods of economizing on their energy consumption, typically by the use of more energy-efficient generation processes. The combined gas and steam turbine process is one example of a step in this direction. This article reviews an investigation that has, among other things, demonstrated the feasibility of increasing the electricity produced by a back-pressure power generation plant by 30 to 40 percent for the same thermal load by combining an industrial back-pressure power generation plant with a gas turbine. In the long term this should prove highly attractive, since the electricity produced by back-pressure generation requires only half as much fuel input as electricity generated in a condensing steam power station.



Denna post skapades 2012-01-12.
CPL Pubid: 152688

 

Institutioner (Chalmers)

Institutionen för värmeteknik och maskinlära (1949-2002)

Ämnesområden

Kemiteknik

Chalmers infrastruktur