CPL - Chalmers Publication Library
| Utbildning | Forskning | Styrkeområden | Om Chalmers | In English In English Ej inloggad.

Location of kit preparation – Impact on in - plant materials supply performance

Robin Hanson (Institutionen för teknikens ekonomi och organisation, Logistik och transport) ; Mats I. Johansson (Institutionen för teknikens ekonomi och organisation, Logistik och transport) ; Lars Medbo (Institutionen för teknikens ekonomi och organisation, Logistik och transport)
International Journal of Industrial Engineering and Management (2217-2661). Vol. 2 (2011), 4, p. 123-129.
[Artikel, refereegranskad vetenskaplig]

The current paper aims to determine how the location of kit preparation affects in-plant materials supply performance. To achieve this, three different cases were identified, where principally different locations for kit preparation could be studied and compared: (1) at the assembly line, (2) in the main storage of the assembly plant, and (3) in a separate kit preparation area in-between storage and assembly line. By use of a theoretical framework, developed in the paper, an analysis is made of how the materials supply performance in the cases is linked to the location of the kit preparation.

Nyckelord: Kitting, location of kit preparation, in-plant materials supply



Den här publikationen ingår i följande styrkeområden:

Läs mer om Chalmers styrkeområden  

Denna post skapades 2011-12-28. Senast ändrad 2017-10-03.
CPL Pubid: 151049

 

Institutioner (Chalmers)

Institutionen för teknikens ekonomi och organisation, Logistik och transport (2005-2016)

Ämnesområden

Produktion
Transport
Produktionsteknik

Chalmers infrastruktur