The New Cern-Isolde Online Mass-Separator Facility at the Ps-Booster

E. Kugler ; D. Fiander ; Björn Jonson (Institutionen för experimentell fysik, Subatomär fysik) ; H. Haas ; A. Przewloka ; H. L. Ravn ; D. J. Simon ; K. Zimmer
Nuclear Instruments & Methods in Physics Research Section B-Beam Interactions with Materials and Atoms (0168-583X). Vol. 70 (1992), 1-4, p. 41-49.
[Artikel, refereegranskad vetenskaplig]

The ISOLDE on-line isotope separators have been operated since 1967 at the CERN-SC. This 600 MeV proton synchro-cyclotron had to be shut down in December 1990 after 33 years of service and it was decided to move ISOLDE to a new experimental area. The new on-line mass-separator facility is now under construction at the CERN PS-Booster. This accelerator provides an average current of about 2-mu-A of 1 GeV protons in very short high intensity pulses at low repetition rate. The beam can hit either one of the two target stations, the general purpose separator (GPS), a reconstructed ISOLDE-2 type machine (which can deliver beams simultaneously into three beam lines), and the high resolution separator (HRS), which is essentially the slightly modified ISOLDE-3 separator. The central GPS beam line and the HRS feed a common beam transport system to which most of the experiments will be connected. The new facility will be taken into operation in spring 1992.

Nyckelord: BEAMS



Denna post skapades 2006-08-28. Senast ändrad 2007-08-23.
CPL Pubid: 11109

 

Läs direkt!


Länk till annan sajt (kan kräva inloggning)


Institutioner (Chalmers)

Institutionen för experimentell fysik, Subatomär fysik (1900-2005)

Ämnesområden

Annan fysik

Chalmers infrastruktur