CPL - Chalmers Publication Library
| Utbildning | Forskning | Styrkeområden | Om Chalmers | In English In English Ej inloggad.

Results to exemplify the joint EU-project INNOTRACK – Innovative track systems

Björn Paulsson ; Anders Ekberg (Institutionen för tillämpad mekanik, Material- och beräkningsmekanik) ; Francis Delooz
Proceedings 9th International Heavy Haul Conference (IHHA2009) Vol. 1 (2009), p. 128-134.
[Konferensbidrag, refereegranskat]

The INNOTRACK R&D project is today in its third year. Today about 100 deliverables out of 130 are ready. The research in INNOTRACK focuses on mixed traffic and deals with three key parts of the track namely track support structure, switches & crossings and rails & welding. The innovative results from INNOTRACK are, in addition to the technical analysis, scrutinized from an LCC and RAMS perspective as well as from a logistic standpoint. The result shows that significant reduction to costs is possible to reach. The paper gives a short overview of INNOTRACK and then goes into more detail on some results with bearing to heavy haul operations.

Nyckelord: Rails & welding, switches & crossings, substructure, LCC & RAMS, logistics, insulated joints, inclined piling, track and vehicle characteristics, hollow sleepers, alarm limits, wheel flats

Denna post skapades 2010-01-14. Senast ändrad 2014-09-17.
CPL Pubid: 107307


Institutioner (Chalmers)

Institutionen för tillämpad mekanik, Material- och beräkningsmekanik



Chalmers infrastruktur